Downloads Downloads  

Click on a file you wish to download to add it to the "Download Queue" on the right. When all the files you want to download are in the queue, click "Download Now!". Fill-out and submit the form to receive an e-mail containing exclusive links to download the files.

Filename Title/Description DLs
APSDS_5.0_Install.exe (10,096.54 KB)APSDS 5.0 - Full Install
APSDS 5.0e (3 August 2011)- Full Install
1997
APSDS_5.0_Service_Pack.exe (4,407.25 KB)APSDS 5.0 - Service Pack
APSDS 5.0e (3 August 2011) - Service Pack - if you already have installed APSDS 5.0.
127
APSDS_5.0_User_Manual.pdf (1,392.45 KB)APSDS 5.0 - User Manual
APSDS 5.0 User Manual (DRAFT).
1178
APSDS_Pricelist.htm (15.02 KB)APSDS Pricelist and Evaluation Version Instructions
APSDS Pricelist and Evaluation Version Instructions.
838
Asphalt_Modulus_Estimate.xls (36.86 KB)Excel Spreadsheet - Asphalt properties.
Excel Spreadsheet for estimating Asphalt properties.
1579
Barker_Brabston_sublayering_moduli.xls (35.84 KB)Excel Spreadsheet - Barker Brabston sublayering moduli.
Excel Spreadsheet to calculate Barker Brabston sublayering moduli. Note that these calculations are built into HIPAVE and APSDS.
836
CIRCLY_5.0_Install.exe (9,072.05 KB)CIRCLY 5.0 - Full Installation.
CIRCLY 5.0s (25 October 2011) - Full Installation. If you are already running CIRCLY 5.0 you can save time by installing the Service Pack instead.
3554
CIRCLY_5.0_New_Features_Guide.pdf (555.77 KB)CIRCLY 5.0 - New Features Guide.pdf
CIRCLY 5.0 New Features Guide Draft 5.0.013.pdf
852
CIRCLY_5.0_Service_Pack.exe (3,398.03 KB)CIRCLY 5.0 - Service Pack
CIRCLY 5.0s (25 October 2011) - Service Pack - if you already have installed CIRCLY 5.0.
1640
CIRCLY_5.0_User_Manual.pdf (1,389.27 KB)CIRCLY 5.0 - User Manual
CIRCLY 5.0 - User Manual - Version 5.0.053.pdf
1827
CIRCLY_Pricelist.htm (16.86 KB)CIRCLY Pricelist and Evaluation Version Instructions
CIRCLY Pricelist and Evaluation Version Instructions.
1802
CIRCLY_Standard_Licence_Agreement.pdf (100.47 KB)CIRCLY 5.0 - Standard Licence Agreement
CIRCLY 5.0 - Standard Licence Agreement
32
CIRCLY_Theory_and_Background_Manual.pdf (213.87 KB)CIRCLY Theory and Background Manual
CIRCLY Theory and Background Manual - Draft 1
1226
CIRCLY_Workshop_3_Slides_Per_Page.pdf (3,098.04 KB)CIRCLY Workshop Notes - 3 Per Page
CIRCLY Workshop Notes - updated May 2011. 3 Slides per Page.
415
CIRCLY_Workshop_ONE_Slide_Per_Page.pdf (3,143.66 KB)CIRCLY Workshop Notes - ONE Per Page
CIRCLY Workshop Notes - updated May 2011. ONE Slide Per Page.
616
Heavy_Duty_Pavement_Design_Guide.pdf (543.94 KB)Heavy Duty Industrial Pavement Design Guide
Heavy Duty Industrial Pavement Design Guide - Revision 1.035 - 19 March 2007.
2218
HIPAVE_5.0_Install.exe (9,291.46 KB)HIPAVE 5.0 - Full Install
HIPAVE 5.0n (2 August 2011) - Full Install. If you are already running HIPAVE 5.0 you can save time by installing the Service Pack instead.
1030
HIPAVE_5.0_Service_Pack.exe (4,836.18 KB)HIPAVE 5.0 - Service Pack
HIPAVE 5.0n (2 August 2011) Service Pack - if you already have installed HIPAVE 5.0.
392
HIPAVE_Materials_6_Slides_Per_Page.pdf (1,455.51 KB)HIPAVE / Heavy Duty Pavement Design Workshop / Materials by Ian Rickards / 6 Slides PP
HIPAVE / Heavy Duty Pavement Design Workshop / "Materials Characterisation & Performance Delivery" by Ian Rickards / 6 Slides Per Page
402
HIPAVE_Materials_ONE_Slide_Per_Page.pdf (4,232.31 KB)HIPAVE / Heavy Duty Pavement Design Workshop / Materials by Ian Rickards / ONE Slide Per Page
HIPAVE / Heavy Duty Pavement Design Workshop / "Materials Characterisation & Performance Delivery" by Ian Rickards / ONE Slide Per Page
319
HIPAVE_Pricelist.htm (14.97 KB)HIPAVE Pricelist and Evaluation Version Instructions
HIPAVE Pricelist and Evaluation Version Instructions.
692
HIPAVE_Sensitivity_Study_1_Slide_PP.pdf (226.17 KB)HIPAVE / Heavy Duty Pavement Design Workshop / Sensitivity Case Study by Ian Rickards / ONE Slide PP
HIPAVE / Heavy Duty Pavement Design Workshop / "Sensitivity Case Study" by Ian Rickards / ONE Slide Per Page.
238
HIPAVE_Sensitivity_Study_6_Slides_PP.pdf (523.31 KB)HIPAVE / Heavy Duty Pavement Design Workshop / Sensitivity Case Study by Ian Rickards / 6 Slides PP
HIPAVE / Heavy Duty Pavement Design Workshop / "Sensitivity Case Study" by Ian Rickards / 6 Slides Per Page.
167
HIPAVE_User_Manual.pdf (1,387.61 KB)HIPAVE User Manual
HIPAVE User Manual - 26 June 2007.
602
HIPAVE_User_Notes.pdf (700.08 KB)HIPAVE User Notes
HIPAVE User Notes - 11 October 2005. As HIPAVE includes all the features of CIRCLY 5.0, these notes only cover the features that are different to CIRCLY 5.0. If you have not already used CIRCLY 4.0 or 5.0, please refer to the HIPAVE User Manual.
307
HIPAVE_Workshop_3_Slides_Per_Page.pdf (3,415.87 KB)HIPAVE / Heavy Duty Pavement Design Workshop / Main Presentation / 6 Slides Per Page
HIPAVE / Heavy Duty Pavement Design Workshop - Revised May 2009 / Main Presentation / 3 Slides Per Page
238
HIPAVE_Workshop_ONE_Slide_Per_Page.pdf (3,434.71 KB)HIPAVE / Heavy Duty Pavement Design Workshop / Main Presentation / ONE Slide Per Page
HIPAVE / Heavy Duty Pavement Design Workshop - Revised May 2009 / Main Presentation / ONE Slide Per Page
298
Sample_Pavement_Design_Report.pdf (191.95 KB)Sample Client Pavement Design Document
Sample Client Pavement Design Document by Graham Foley (May 2003). This report, written by a specialist pavement engineer, Graham Foley, is an example of using the general mechanistic procedure to refine an existing pavement design to provide an alternative pavement design. It will be of use to both experienced and less-experienced pavement designers as how to approach and document a mechanistic design.
1611
Page: 1 

Download Queue
No downloads in queue.

Valid XHTML 1.0!